Service · fabrication
A saw, a welder
and a yard full
of raw material.
Not every job is served by a tote in its factory shape. We cut, plumb, frame, port and mark them — usually in two days, usually from stock that would otherwise have been granulated.

The short answer
We fabricate open-top conversions, horizontal and vertical splits, lid and agitator ports, plumbed multi-tote assemblies, skid and stand frames, grounding lugs and fleet marking. Standard cuts turn around in two business days; plumbed assemblies in three to five. We'll work on your own totes if you prefer.
From the yard


Capabilities
Eight things we build
Open-top conversions
Cut below the gasket line · deburred · edge-capped
Horizontal & vertical splits
Two beds per tote · cage retained
Lid and agitator ports
Custom diameter · reinforced
Plumbed assemblies
Valves · manifolds · sight tubes
Skid & stand frames
Welded steel · forkable
Grounding & bonding
Lugs · straps · continuity tested
Fleet marking
Tags · plates · colour coding · stencil
From a sketch
Napkin drawings accepted
Turnaround
What each job takes
Lead times assume the material is on the yard, which it usually is. Jobs on your own totes add collection time.
| Job | Typical turnaround | On your totes? | Notes |
|---|---|---|---|
| Open-top conversion | 2 business days | Yes | Prior contents required before we cut |
| Horizontal split (2 beds) | 2 business days | Yes | Food growing requires F-grade stock |
| Wicking planter build | 3 business days | Yes | Supplied barriered and drilled, not filled |
| Lid / agitator port | 1–2 business days | Yes | Specify diameter and position |
| Plumbed assembly | 3–5 business days | Yes | Leak-tested before dispatch |
| Skid or stand frame | 3–5 business days | Yes | Welded steel, forkable |
| Grounding lug + continuity test | 1–2 business days | Yes | Certificate of continuity supplied |
| Fleet marking | Same day on small batches | Yes | Tags, plates, stencil, colour coding |
Safety
The edge nobody thinks about
HDPE cut with a jigsaw or a hot knife leaves an edge that behaves like a serrated blade — worse, because it looks like plastic and people reach over it without thinking. It is the reason we deburr and cap every edge we cut, and the main reason we suggest letting us do the cutting.
Standard finish on every cut job:
- Mechanically deburred along the full cut line
- Edge trim or capping fitted where hands will go
- Cage members cut back and dressed where they cross the cut
- Any sharp cage stub ground flush
Limits
What we won't fabricate
Pressure vessels
A modified IBC is not a pressure vessel and no amount of welding makes it one.
Structurally certified assemblies
Anything needing an engineer's stamp needs a shop that can provide one.
Occupied structures
People build sheds and pools from totes. We won't help — the material isn't rated for it.
Food beds from unknown totes
Prior contents or no cut. Not negotiable.
Fuel transport modifications
Totes are not DOT-approved for fuel on public roads, modified or otherwise.
Why fabrication is part of a reuse business
A meaningful share of what arrives here is structurally sound but commercially unsellable — heavily stained bottles, cosmetically rough cages, sizes the used market does not want. Under the old model, those units went straight to granulation.
Fabrication gives them a fourth option. A tote that nobody will buy for chemical storage is a perfectly good raised bed, spent-grain bin or washout container, and cutting it costs a fraction of the energy that granulating and re-moulding it would. It is the third rung of the reuse hierarchy, and it is where a surprising amount of our volume ends up.
Standard builds we keep in stock
Open-top bins, split beds and wicking planters move often enough that we cut them ahead of demand. Those are listed with dimensions on the second-life builds page. Everything else is made to order.
Working from a drawing
Send dimensions, a photograph of something similar, or a sketch. We will come back with a price, a lead time and — where it matters — a note about what the modification does to the container's structural limits. That last part is not upselling; it is the difference between a build that lasts a decade and one that folds in a season.
Questions people actually ask
+What's the turnaround on a fabrication job?
+Can you work on totes I already own?
+Is a cut tote still structurally sound?
+Do you weld the steel cages?
+Can you brand or label cages?
Quick reference
Numbers worth having open in another tab
The figures that come up in almost every conversation, whichever page you arrived on.
275 gallon · 1040 L
48×40×46
- Tare
- 130 lb
- Gross, water
- 2,425 lb
- Stack full
- 2 high
- Stock
- Always in stock
330 gallon · 1250 L
48×40×53
- Tare
- 160 lb
- Gross, water
- 2,915 lb
- Stack full
- 2 high
- Stock
- Always in stock
264 gallon · 1000 L
48×40×46
- Tare
- 125 lb
- Gross, water
- 2,325 lb
- Stack full
- 2 high
- Stock
- Usually in stock
350 gallon · 1325 L
48×40×56
- Tare
- 175 lb
- Gross, water
- 3,095 lb
- Stack full
- 2 high
- Stock
- Order in
From the yard notes
Longer reading on this
32 articles written by the people who wash, grade, weld and dispatch. No marketing copy in any of them.
- How-to · October 5, 2022 · 3 minStacking Limits That Actually HoldFour variables decide the answer: full or empty, moving or static, matched pallets or mixed, and what they're standing on.
- How-to · February 2, 2023 · 3 minWhy Your Valve Choice Costs You an Hour a WeekThe cheapest component on the container decides how much of your week you spend watching liquid move.
- Reconditioning · June 8, 2021 · 4 minInside a Caustic Clean-in-Place CycleSix stages, 110 gallons of water, 160 degrees and a piece of paper. Here's each part and why it's there.
On the yard this week


More answers
While you're here
Pulled from the full FAQ, which runs to forty-plus answers across buying, grades, food safety, sizes, selling, compliance, delivery and care.
- Where we are
- 3505 Montopolis Dr, Austin, TX 78744
- Yard hours
- Mon–Thu 7:30a–5p · Fri 7:30a–4p · Sat 8a–12p · Sun closed (Central Time)
- Coverage
- 68 Texas counties on scheduled routes, from one Austin yard.
+Can I put drinking water in a used tote?
+Which grade should I buy?
+Can I buy a single tote?
+How long does an IBC tote last?
+Can I pick up at the yard?
Describe it in three lines.
What it needs to do, roughly what size, and how many. That's enough for a price and a lead time — drawings optional.